New Visitor Developments

Listed below are some changes and renovations expected with existing visitor-related features in Durham as well as new items currently under development or in the planning stages. If you have any questions or would like more information about any of these visitor developments, contact Reyn Bowman, President & CEO, at reyn@durham-cvb.com or (919) 680-8300 (primary), or Jonathan Freeze, Assistant Director of Marketing & Communications, at jonathan@durham-cvb.com or (919) 680-8319.

 

Name Location Description Status Opening Date
American Tobacco Campus (former Lucky Strike Cigarette Factory)North of Durham Bulls Athletic Park, bounded by S Mangum St, Jackie Robinson Dr, W Chapel Hill St, and W Pettigrew StOne of the most ambitious, largest, and farthest-reaching historic preservation and renovation projects in NC history. Phase I: Rehabilitation of 496,000 sq. ft. of former factory for commercial, office, laboratory, research, and retail use; construction of north (1,311 spaces) and south (1,141 spaces) parking garages. Phase II: $65 million renovation of 6 structures on the original factory campus totaling nearly 330,000 sq. ft., consisting of the Hill Building (retail/parking, 64,000 sq. ft.), Old Bull Building (a National Historic Landmark, residential, 133,422 sq. ft.), Shed Building (retail, 9,425 sq. ft.), Noell Building (retail/residential, 41,600 sq. ft.), Lucky Strike Building (office, 60,900 sq. ft.), and Power House (restaurant/residential, 19,387 sq. ft.). Phase III: 400 to 500 apartments in as many as 7 buildings plus Diamond View II office complex, northeast of DBAP and surrounding new Downtown performing arts theater. Phase IV: Other development under consideration for 31.4 acres northwest of Phase I-II campus.Phase II: Construction began May 2005Phase II: Complete 2007
Phase III: Groundbreaking Spring 2006Phase III: Complete Late 2007
Phase IV: TBDPhase IV: TBD
American Tobacco Trail (Segment from Hwy 54 South)Currently beginning just south of Downtown's Durham Bulls Athletic Park running to Hwy 54 in South Durham, then from Massey Chapel Rd to Chatham County line23-mile, 3-county project with 12 miles in Durham stretching from Downtown Durham south across Interstate 40 to the county line.Phases A-D: Durham Bulls Athletic Park to Hwy 54Phases A-D: Open
Phase E: Hwy 54 to Massey Chapel Rd (0.75 mile) - to include bicycle/pedestrian bridge over I-40 and partial paving of segments south of The Streets at Southpoint mall; design contract under review February 2006Phase E: Complete 18 months after contract awarded; estimated Early 2010
Amtrak StationGreat Jones and West Main 11,000 sq. ft. space in the historic Walker Warehouse, adjacent to several other historic Liggett & Myers buildings, which are being refurbished for residential, entertainment and office. Convenience, pedestrian traffic flow and safety as well as the city's revitalization program make this an ideal location for the station.Amtrak Station December 2008
City of Medicine Academy Durham Regional Hospital campus City of Medicine Academy (CMA) is a high school curriculum program that provides four-year health career strands (academic and health science elective courses) for students pursuing healthcare related careers after graduation. A permanent location for CMA will be built in 2011 on the Durham Regional Hospital campusCity of Medicine AcademyTBA
City of Medicine CenterFive-acre site at the Durham Veterans Affairs Medical Center on Erwin Rd$150 million, 750,000-sq.-ft. project with seven buildings, including a new VA research facility, an eight-story hotel, and office/retail space. Phase 1: 3 buildings. Building 1 is 65,000 sq. ft. housing office and retail space. Building 2 is 200,000 sq. ft. housing seniors, including independent and assisted living quarters. Building 3 is a 150-room, 75,000-sq.-ft. hotel, with 12,000 sq. ft. of retail space on the top floor. The project also will require $500,000 in road improvements; will enlarge the VA parking deck from 1,000 to 2,500 spaces; and will house a health sciences academy (science and nursing labs, classrooms, patient simulators, conference room, auditorium) serving 400 students from Southern High School (2006-2007).Phase 1: Construction to begin Summer 2004Phase 1: TBD
Davis Drive WideningDavis Drive$35.5 million contract to widen more than 5 miles of Davis Drive from Morrisville-Carpenter Rd to N.C. 54 in RTP.To begin February 2007November 2009
Dinosaur Trail at the Museum of Life and Science433 Murray AveDinosaur Trail will feature lifelike late-Cretaceous dinosaur models and a dig site where visiting "paleontologists" can unearth real fossils. Part of 40-acre expansion plan to add three major outdoor exhibits to the Museum of Life and Science, while also improving museum infrastructure (improved entryway and new outdoor entry pavilion).Construction timeline TBDGrand opening 2009
Downtown Patrol District Substation (Rigsbee/Broadway Renovation)516 Rigsbee Ave and 213 Broadway St$4.6 million project to renovate two City-owned buildings to better house the Police Department Forensic Services Unit, the Downtown Patrol District substation, and the Special Operations Division. The front half of the Rigsbee Ave building will become the first substation for the Downtown patrol district, while the back half will become a new forensics lab. The Broadway St building will become a new home for the Special Operations Division.City Council approved construction contract Dec. 07'Bid project phase 30% complete
Duke University Central Campus RedevelopmentCentral Campus$240 million dollar redevelopment of 200 acres located between Duke’s East and West Campuses, now home primarily to student apartments but considered underutilized. Of the 800,000 sq. ft. projected for construction, 150,000 sq. ft. will be for academic buildings. The additional space will be created for 1,200 apartments, eateries, a bookstore, fitness facilities, a basketball practice facility and some retail establishments. Phase 1 of construction will cover about 50 acres.Phase 1: Complete Fall 2008.Phase 1: Residential Housing, Fall 2008
Phase 2: TBDPhase 2: TBD
Durham Central Park SkateparkDurham Central Park, Rigsbee Ave.Durham's planned skateboard park will soon move into the design and construction phases. Approved increased funding for the project by $225,000, which will allow the project to move forward. The skateboard park will be located at Durham's Central Park. TBDTBD
Durham County Human Services Complex400 block of E Main St, Government Services District, Downtown Durham$78 million 250,000-sq. ft. complex that will house the Durham Center, Public Health Department, and Department of Social Services. Phase 1: Construct a 4- to 6-story building to house the Public Health Department. Phase 2: Demolish the former health department building and construct another 4- to 6-story building across a central courtyard from the first.All Phases: Design contract approved October 2005; construction to begin 2007Phase 1: 2009 Phase 2: Completion 2012
Durham Performing Arts Center (DPAC)7.6-acre site northeast of Durham Bulls Athletic Park at S Mangum St and Vivian St$44 million, 2,800 seat multi-use facility that could house the American Dance Festival each summer and will offer a variety of mid-size performances throughout the year operated by Nederlander/PFM.Breaking ground December 18th, 2006Complete December 2008
Durham Station Transportation CenterPettigrew Street$15.3-million, 14,000-sq.-ft. station will incorporate intra-regional rail service, taxi service, and bus service for DATA, Triangle Transit Authority, Greyhound, and Trailways. At nearby Walker Warehouse (see Liggett Redevelopment Project), passengers can connect with Amtrak service. Landscape/pedestrian component will link Station to American Tobacco Historic District.Schematic design concepts reviewed July 2004; final design reviewed February 2005; construction TBDFebruary 2009
Eno River GreenwayBetween Eno River State Park in the west and Falls Lake State Recreation Area in the eastPhase 1: $665,000 project that will include building an 8-foot-wide, 3/4-mile trail from West Point on the Eno City Park to River Forest City Park; also will include a new, steel, bicyclist/pedestrian bridge that will cross the river near West Point Mill. Later phases will extend the trail to Penny's Bend Nature Preserve and link up with the statewide Mountains to Sea Trail.Phase 1: Construction to begin Summer 2005Phase 1: Complete Fall 2006
Few Gardens Hope VI Revitalization Project96-block area in East Durham at Few Gardens neighborhood415-unit housing development as well as business locations. Home façades, streetscapes, and commercial areas in the mixed-income neighborhood will feature historically themed architecture and detailing. Phase 1: 43 townhouse-style units in 4 buildings facing East Main St and North Elizabeth St. Phase 2 includes a 75-unit family community located in the Edgemont area and a 25-unit senior community located on a site at Alston Ave and Morning Glory Ave.Phase 1: Construction began December 2003Phase 1: Complete December 2004
Phase 2: Construction begins Early 2005Phase 2: Complete March 2006
Golden Belt900 East Main StThe creatively restored Golden Belt will enliven East Main Street's spectacular sevenacre historic textile mill campus with a creative arts, pedestrian-focused atmosphere. The campus will feature an uncommonly thoughtful blend of arts, commerce and living with 35 sky-lit artist studios open to the public, 37 modern live/work loft apartments, fresh and innovative retail and restaurant concepts, creative office space, a live music venue, art galleries, green space, festival space, fitness options, and convenient parking. Golden Belt will be a one-of-a-kind, pedestrian-focused, creative arts hub.This historic restoration project forges a modern industrial aesthetic with green design to create truly unique spaces. As a venue for artists, emerging entrepreneurs and creative people, the restored campus honors the innovation of Julian Shakespeare Carr, the factory's founder, and reaffirms the spirit of creativity that is Golden Belt's legacy.Projected May 2008
Hill Building Conversion: Downtown Boutique Hotel111 Corcoran StPlans call for converting the 17-story bank building into a 110-room boutique hotel featuring penthouse condominiums, a restaurant, upscale services and spa offerings. When finished, it could be the first hotel to be LEED certified in North Carolina. January 2009
Historic Durham Athletic Park RedevelopmentCorner of Corporation St and Morris Street$11 million dollar renovation of the historic ballpark built in 1926. Initial plans also call for $5 million in renovations to ballpark including new locker rooms, training rooms, and a refurbished field. Construction begins July 22, 2008November 2008
TBD2010
Leigh Farm ParkSouthwest Durham 89-acre park will include an 18-hole disc golf course, three buildings for Piedmont Wildlife Center; and restoration of the historic garden of heirloom flowers. Leigh Farm Park Summer 2008
Mangum 506506 N Mangum St (NE corner of N Mangum St and E Seminary St intersection)Mixed-use project consisting of 22 residential condos and 5,000 sq.ft. of professional/retail space in two, three-story buildings. Residential units will feature a variety of floor plans with 10' ceilings, hardwood floors, stainless steel appliances, Juliet balconies, and private garages for most. Commercial/retail tenant TBD.All units reserved (waiting list available); construction to begin Spring 2006Complete Winter 2006
McPherson Hospital Redevelopment Project1110 W Main StRedevelopment of the former McPherson Hospital complex into a 100-room boutique hotel, along with residential, restaurant/retail, and office space. Plans call for renovation of the 1926 Colonial Revival brick hospital building, demolition/removal of other buildings, and new construction for the hotel, restaurant, and residences.Rezoning approved September 2005; site planning and architectural design underwaymid 2009
Mike Krzyzewski Center for Athletic Excellenceadjacent to David Rubenstein Center, Duke University West Campus56,000 sq.-ft. facility with two full-sized basketball courts, a training facility with a world-class weight and conditioning room, Legacy Locker Rooms and a state of the art team and individual video viewing complex. Will house the new University Events Center which will include banquet space for up to 300 people. Plans call for the Events Center to become Duke's premier banquet space as well as an area to celebrate Duke's athletic tradition.Construction underwayEarly 2008
NCCU Expansion ProjectNCCU, 1801 Fayetteville StFour phases of development will expand the growing NCCU campus. Expansion includes: adding two new parking decks, a new student union, a new library and renovation of the current library, several new commons areas, a new convocation center on Fayetteville St. NCCU ExpansionPhase I : 2010; All Phases Complete 2024
Newhope Church7619 Fayetteville Rd, less than one mile south of The Streets at Southpoint35,000-sq.-ft. facility on 27 acres to serve the growing congregation of Newhope Church, relocating to Durham from its Chapel Hill location (740 Gimghoul Rd) and rented space (4310 Garrett Rd).Groundbreaking Fall 2006December 2008
North Carolina Central University Athletics UpgradeNCCU, 1801 Fayetteville StTrustee-approved move from NCAA Division II and the Central Intercollegiate Athletic Association to NCAA Division I-AA and the Mid-Eastern Athletic Conference (MEAC). NCCU will start adding MEAC teams to its roster starting in school year 2006-07, and the upgrade would occur gradually over 5 years.Board of Trustees approved upgrade November 2005Complete 2011
Parks & Recreation Improvements5-8 new or upgraded multifunctional parks including: Herndon - new soccer and baseball fields, playground, picnic shelter, parking, and more. Duke Park - replacement of playground equipment, new pedestrian walkways, and small area for skateboarding. West Chapel Hill Road - athletic fields, restrooms, picnic areas, play areas, and aquatic complex.Herndon - Construction began May 2004Herndon - Complete Fall 2007
Duke Park - Construction underwayDuke Park - Complete July 2005
West Chapel Hill Rd Park - Master Plan process underway; construction to begin Spring 2005West Chapel Hill Road - TBD
Pavilion East at LakeviewErwin Rd and LaSalle St, alongside the Lofts at Lakeview$30 million, 150,000-sq.-ft. mixed-use project with 100,00-sq.-ft. of commercial space with retail on the ground floor and office space on the second and third floors. Fourth floor will be 28 luxury loft condos that start at $300,000.Construction underway February 2006Complete Fall 2007
Perkins Library ProjectDuke University West CampusThe Perkins Project will expand and renovate the William R. Perkins Library, Duke's largest. Phase 1: Construction of a 5-story structure linked to Perkins and the renovation of the 1st floor of the 1968 building. The plan will be implemented in phases so that library operations can be maintained throughout the project.Phase 1: Construction began December 2003Phase 1: Construction timeline complete Mid 2006; subsequent phases complete by 2009
RDU Terminal Renovation, Expansion, and RedevelopmentTerminal 2, RDU International AirportPotentially $570-million project will remake Terminal 2 into RDU’s primary terminal (more than doubling its size), with an intuitive layout and new design features (such as ticket “islands” and electronic signage), larger ticketing and enhanced security areas, a wider and longer concourse (with moving walkways and state-of-the-art baggage handling), more gates and boarding bridges, and a new federal inspection facility. Phase I: Preparations for demolition of the north concourse, demolition work, and preparations for new construction. Phase II: Construction of north concourse and three-fourths of new ticketing, baggage claim, and security checkpoint. Phase III: Final construction of remaining one-fourth and central concourse. Additional phase could redevelop the south concourse of Terminal 2 (to be determined by June 2007).Phase I: Began Fall 2004Phase I: Complete Summer 2006
Phase II: Begins March 2006Phase II: Complete Summer 2008
Phase III: Begins Summer 2008Phase III: Complete Summer 2010
Ruths Chris Steak Houselocated in the Hilton Garden Inn Durham Southpoint Ruths Chris Steak House will be located in the Hilton Garden Inn Durham Soutpoint location. It will be open for dinners and the attire will be business casual. Summer 2008
Snow Building331 W. Main St. The 75-year old building has been bought and plans for new restrooms, a sprinkler system, wireless internet and a modern elevator are in the works. The functions of the building will be kept the same - 3,000 square feet of retail space on the first floor, and the rest of the seven floors will have office units throughout. August 2008
The Renaissance at Durham CentreNext to existing Durham Centre tower above the Morgan Street parking deck across from Carolina Theatre15-story tower of 186 plush condos, a restaurant, and potentially a five-star hotel. Estimated cost: $50 million. Amenities could include a doorman, health club, concierge service, valet parking, security, swimming pool, and meeting and entertainment space.Construction to begin when 40% of condominiums are reservedTBD
Treyburn CommonsCorner of N Roxboro and Orange Factory Rd$20 million, 90,000 sq.-ft. neighborhood shopping center. Will include a grocery store, drugstore, bank, restaurant, and a mix of retail shops.TBDTBD
Trinity LoftsIntersection of West Trinity Avenue and Washington Street$5 million renovation converting a 75 year-old, 29,000 sq.-ft. tobacco warehouse into a residential complex. The high-design lofts will feature private parking and private garden for each condo.Break ground mid March 08estimated completion date Oct. 08'
Trinity Place700 W Trinity Ave, SW corner of W Trinity Ave and Washington StMixed-use project offering 10,200 sq.ft. of office space, 3,000 sq.ft. of retail/restaurant space, and 14,000 sq.ft. of residential space in three buildings. Tenants TBD.Construction begins Summer 2006Complete Spring 2007
University Place (Regency Plaza) Redevelopment3117 Shannon Rd$50 million project that includes razing the current Regency Plaza and building a mixed-use community with retail shops on the ground level and apartments or condos stretching four or five floors. Plans call for up to 140,000 sw.-ft. of commercial space and up to 389 residential units.Redevelopment underwayTBD
Venable CenterS Roxboro St between E Dillard St and E Pettigrew StMulti-million dollar project to redevelop 5 buildings on a 3-acre site into an R&D campus with 100,000 sq. ft. of lab and office space. Phase 1: Renovate southernmost, one-story building into 13,000 sq. ft. of lab space. Other phases TBD. Tenants to include Independent Weekly and Somerhill Gallery.Phase 1: Renovation began December 2004Phase 1: Complete Spring 2006
West Village - Phase 2 (Liggett Redevelopment Project/Amtrak Station)West Main St between S Duke and Great Jones Sts, east of Brightleaf SquareThe largest certified historic tax credit preservation project in the state, Phase 2 plans call for the adaptive reuse of 7 additional buildings of the Liggett & Myers complex, built between 1884 and 1949, for $150 million. Totaling over 992,000 sq. ft., Phase 2 consists of an additional 366 loft-style apartments, 164,000 sq. ft. of class A office/lab space, and 58,000 sq. ft. of retail space on Downtown's Main Street. A new station for Amtrak may be located on site (Walker Warehouse). This project meshes with the adjacent West Village - Phase 1, totaling 12 buildings with 1.26 million sq. ft. upon completion. Groundbreaking November 2006March 26, 2008
Woolworth Site Redevelopment Project124 W Main StProject to redevelop 0.54 acres on which the historic Downtown Durham Woolworth store sat for mixed uses, possibly including residential, office, and retail and amounting to more than 75,000 sq. ft. (at least 4 stories but possibly 13 stories). The building also will feature a 5,000 sq. ft. Durham Common Room, museum-like space leased to the City for telling Parrish Street's nationally significant history (see Parrish Street Revitalization and Commemoration Project).Real estate contract executed June 2005Final plans laid and financing secured by Summer 2007

 

Developments Under Consideration

Asiatic Garden Pavilion at Sarah P. Duke Gardens
The Sister Cities of Durham Toyama Committee has worked with the Gardens to reach a preliminary agreement on structure/location; Derek Jones Architect preparing additional material for further consideration/fundraising.

City Park and Athletic Field Complex
Snow Hill Rd, just southwest of Little River Reservoir, opposite Northwood Forest neighborhood - proposed $9 million, 105-acre complex featuring 8 athletic fields and adjacent to a planned middle school. Once funding is in place, site development could take 2 years.

Duke University Central Campus
200 acres located between Duke’s East and West Campuses, now home primarily to student apartments but considered underutilized; draft development plan complete; goal to complete a more sophisticated plan for proceeding to construction of the first phase of Central Campus by Winter 2005/06; target for occupancy of new residences Fall 2008.

East End Connector
$100 million highway to link the Durham Freeway and US 70, creating a stoplight-free route from I-40 in South Durham to I-85 in Northeast Durham (estimated to start: 2012; completion 2016-17).

Emily Krzyzewski Family Life Center
Burch Ave - 11,000 sq. ft. including meeting rooms, a kitchen w/ serving areas, exercise facilities, gym with spectator seating. Still raising $6.4 million in funding.

Garrett Rd Extension
City plan to extend Garrett Rd (400 feet, $700,000) across NC 751 to NC Hwy 54; currently drivers must turn south on NC 751 and make another turn to head east or west on NC Hwy 54. Construction could start Spring 2006 and end Late 2006.

Hayti Museum Project
Former Mechanics & Farmers Bank building on Fayetteville St becomes an artifacts museum including Blues History.

Hope Valley Commons Shopping Center
26 acres at the southeastern corner of NC Hwy 751 and NC Hwy 54 rezoned in 2000 for shopping center and apartments; in Early 2005, developers submitted new rezoning application for 160,800-sq.-ft. shopping center only.

Horton Grove Cultural Park
76-acre cultural park to protect, preserve, and interpret the area around Horton Grove near Historic Stagville; both the proposed park and surrounding neighborhood are under development by Bryan Properties. Charrettes held September 2003 and February 2004; company could break ground on park and neighborhood within 3 years.

NC 147 Bicycle/Pedestrian Bridge Replacement
$2 million project to replace the currently unusable Durham Freeway bridge connecting Lakewood Dr and Lakeland St with a new bridge offering better lighting and visibility; approved by City Council in November 2003; design contract finalized February 2005; construction could begin in Early 2006 with completion by Late 2006.

NC DOT Replacement of Duke East Campus Bridge
Transportation officials are considering two alternatives for the project; acquisition of property for widening begins in 2005, and construction is expected to begin in 2006.

New Durham Courthouse Complex
$80 million, six-story justice center proposed to be built between Mangum and Roxboro Sts, adjacent to Jail. County Commissioners approved plans in 2004; construction could begin in 2005, with completion by 2009.

New Hope Creek Corridor Regional Park
43 acres of former Duke Forest land purchased in April 2005 by the City and County of Durham, Orange County, and Chapel Hill to be developed for recreational use; it is the first regional park partnership between the four local governments; inter-governmental agreement, grant funding, and plans pending.

Ninth Street North, Second Phase
54,000-sq.-ft., retail and office building on the east side of the street would look similar to the existing red-brick Phase One building to the west; if construction costs and leasing plans pan out, construction could begin in July 2005.

North Carolina Central University Athletics Upgrade
Athletics director and committee studying move to NCAA Division I; proposal to be submitted to NCCU trustees by September 1, 2005, in advance of December 1, 2005, deadline to petition NCAA; potential upgrade would occur over five years, making NCCU a full-fledged Division I member by 2011.

North Carolina Central University Campus
Hospitality & Tourism Administration Program Building at Alston Ave and Lawson St; training kitchen and possibly a working lodging property.

Triangle Parkway
Proposed $69 million, 3.2-mile toll expressway connecting I-40 (between Davis Dr and S Miami Blvd) to the future I-540 north of Morrisville; endorsed by Durham City Council and County Commissioners; under review by NC Turnpike Authority in 2005.

Triangle Region Transit Consolidation Plan
A plan developed by the Triangle J Council of Governments and being considered by local governments (including Durham) to consolidate public transit services and functions under one umbrella by 2008; DATA Board approved of the plan in October 2004.

US 15-501 Widening Project
NC DOT plan to widen US 15-501 from Mount Moriah Rd to Garrett Rd (0.9 miles, $10.8 million) and to relocate its service road near Garrett Rd (0.3 miles, $3.1 million). Scheduled to begin 2007.

Valley Creek Center
16.7 acres at the NW corner of Martin Luther King Jr Pkwy and S Roxboro Rd zoned and approved for up to 130,000 sq. ft. of retail (a 110,000-sq.-ft. section and a 20,000-sq.-ft. section); seeking purchaser or awaiting final development plan.